Skip to main content

On June 29, 2026, the Xinjiang Public Resources Trading Center published the public notice of results for the competitive listing and transfer of exploration rights for the Tugeman Sinu gold-copper deposit (Zone 1 and Zone 2) in Akto County, Xinjiang. After 24 days of intense bidding, Zhongjin (Hetian) Mining Development Co., Ltd., a subsidiary of China National Gold Group, secured the exploration permit with a final bid of 2.507 billion yuan (approximately 345 million US dollars).

The Tugeman Sinu deposit is located in the West Kunlun orogenic belt, on the northwestern margin of the Qinghai-Tibet Plateau, at the junction of the Paleo-Asian and Tethyan tectonic domains. The area features complex geological structures and historically intense magmatic activity, creating highly favorable metallogenic conditions for copper, gold, lead, zinc, and iron. In recent years, numerous mineral occurrences have been densely discovered in this region, including the Muji gold deposit, the Karama copper-gold deposit, the Tuoritiwutuo copper-(gold) deposit, and the Kalaguorumu copper deposit.

The deposit was identified during 2023–2024 by the Geophysical and Geochemical Prospecting Center of the Geological Bureau of the Xinjiang Uygur Autonomous Region, under a publicly funded geological survey project titled “General Survey of Gold-Copper Deposits in the Tugeman Sinu Area, Akto County, Xinjiang.” According to currently available exploration data, the gold metal resources have been confirmed to be of medium-scale size, while copper resources are expected to reach at least medium scale as well.

Geological experts have noted in published literature that the Tugeman Sinu deposit is one of the most promising gold-copper targets in the West Kunlun region of Xinjiang. Its discovery represents a major breakthrough in copper-gold prospecting in the area and has significantly expanded the scope for further mineral exploration in the West Kunlun belt.

At present, the project remains in the exploration and prospecting phase (the initial exploration permit is valid for five years). The transition from exploration rights to mining rights, followed by eventual mine construction and production, will require additional time and further capital investment.

Back to Top