Welcome to MiningComm Platform

中文 / EN

Minyari Dome Au-Cu-Ag-Co Project

Location: Covers an area of 144km2, surrounded entirely by the Antipa-IGO Farm-in Project.

041503


Mineral Resources:

ü High grade shoots remain open down plunge at both deposits and include intersections grading up to 295 g/t gold;

ü Indicated and Inferred Mineral Resource of 7.7 million tonnes grading 2.2 g/t gold, 0.3% copper, 0.9 g/t silver and 460ppm cobalt for 550,610 ounces of gold, 22,760 tonnes of copper, 213,520 ounces of silver and 3,540 tonnes of cobalt.

 

Key Components of 2021 Greenfield Programme:

Ø Detailed Drone Magnetic Survey;

Ø Gradient Array Induced Polarisation (GAIP) Survey;

Ø Surface Geochemical Programme (awaiting results);

Ø 12,000m RC Drill Programme (awaiting results for 6,440m).

041504

2022 Forward Plan:

Ø Deliver new, significantly increased resource (April);

Ø Initial assessment of potential development opportunity (CY22 -H1);

Ø Drill test multiple prospects and new targets with potential to further increase the resource and enhance the development potential (CY22).


Our LATAM Partner:MONTT GROUP