Aya Gold & Silver Announces February 2025 Production Results

Montreal, Quebec, March 11, 2025 - Aya Gold & Silver Inc. (TSX: AYA; OTCQX: AYASF) (“Aya” or the “Corporation”) is pleased to announce production of 357,333 ounces (“oz”) of silver (“Ag”) in February at its Zgounder Silver Mine, located in the Kingdom of Morocco.

2025 Production Metrics

Production Metrics
January
2025
February
2025
1
Silver productionoz/month383,515357,333

oz/day12,37112,762
Tonnes processedkt88,68678,755
Milling ratet/op.h2126133
Silver recovery%8783
Mill availability%9588
Mine productiont50,40368,967


  1. Includes five days of planned shut down of the grinding mill of the flotation

  2. Tonnes per operating hour

February Production Highlights

  • Silver (“Ag”) production of 357,333 oz in February 2025 or 12,762 oz per day; an increase in average daily silver production based on 23 days of operation due to lower availability as a result of a planned

  • Silver recovery of 83% in February 2025 due to oxidized ore processing and plant shut down.

  • Combined mill availability of 88% in February 2025.

  • Mine production of 68,967t in February 2025, which represents a 37% increase over January 2025.

"I am pleased to share that we continue to improve the production rate at Zgounder. We see a month-over-month increase in the daily average silver production, but also in the milling and mining rates from January to February 2025. This strong performance is driven by improved mine production, alongside sustained processing capacity over 2,800 tpd since January,” said President & CEO Benoit La Salle. "This achievement included a planned shutdown in a short month, and highlights our disciplined execution and operational strength, setting the stage for sustained production growth and record profitability in 2025."